top of page

BLOG

Planning Your Build? Start Here

Get practical guidance on approvals, council requirements, and common mistakes homeowners make before building - straight to your inbox.

Subscribe to our newsletter

Our Services

We offer a two-part engineering and documentation system designed to make DA/CDC approvals simple and stress-free:

DA Stage.png

Step 1: DA Stage

Includes:

  • Civil Engineering (Concept Stormwater & Drainage Design)

  • Concept Driveway Design

  • Waste Management Plan

  • Sediment & Erosion Control Plan

  • Consultant Coordination

  • Priority Turnaround

  • One Point of Contact

  • Weekly Project Updates

Site Conditions Add Ons:​ only if triggered by your site or council

  • Bushfire Report (BAL Assessment)

  • Flood Report / Flood Impact Statement

  • Landscape Plan

  • Heritage Impact Statement

  • Detail & Level Survey 

  • Acoustic Report

  • Mine Subsidence

  • Retaining Wall Locations

  • Subdivision Design (planning layout only)

structure.png

Step 2: CC (or only CDC)

  • Structural Engineering Footings Design (slab)

  • Civil Engineering (detailed Stormwater & Drainage Design)

  • Structural Engineering Beams Designs (if required)

  • Geotechnical Report

  • Detailed Driveway Design

  • Sydney Water Tap In

  • Consultant Coordination

  • Priority Turnaround

  • One Point of Contact

  • Weekly Project Updates

Site Conditions Add Ons:​ only if triggered by your site or council

  • Retaining Wall Structural Details

  • Driveway Long Section

  • Stormwater Redesign (if DA approved layout changes)

  • OSD System

  • Building Plan Approval (BPA)

  • Instagram
  • Facebook
  • X
  • LinkedIn
  • Youtube
  • TikTok
bottom of page